Granular issue statuses #212151
Replies: 43 comments 44 replies
|
These are the states I want to have.
Where can i customsie the list? |
|
Seems cool. I think you should consider making it possible to customize that list per repository[although would the icons be repository-provided? or from an iconset? or from a constant list with togglable elements provided by github? probably the last one]. |
|
Great thing, I was just looking around for a solution like that. Would it be possible to define custom statuses, with different colors and icons for example? because that would be awesome. |
|
This seems to break our workflow too: What used to happen
What happens now
Why this breaks multi-project trackingA single Issue often tracks work across multiple products where the same Issue is legitimately at different stages in each Project at the same time (e.g. "Done" in one Project while still "Backlog" or "In progress" in another). Automatically syncing Status across all Projects makes independent per-project tracking impossible. Example:
Is there a way to opt-out of this preview, pretty please?I apologize if this is considered cross-posting - I have not noticed this feature's button under Issue's title and the "Give feedback" there until now. |
|
This is overriding my project configuration. I have my Project configured to mark an Issue done when the Project's Status field changes to Released. When I change th Project Status field to Done, the Issue is incorrectly being changed to Done. |
|
This is excellent! It addresses a huge headache we've had for a while. Most teams (us included) probably have built their own fragile/hacky versions of this --- I imagine everyone will want to switch to building their workflows around this :) |
|
This feature definitely needs a turn-off option. |
|
|
How do I add tags though 🤔 This is giving Trello GitHub vibes and I still don't know how to enable the Trello of GitHub thing. |
|
I'd love a top-level status, as we only have one project which we use to manage our issues, but we have multiple repositories. Every time you transfer an issue from one to another repo, it re-adds it to the project and resets the status to what we have set as our default. Our default status is 'triage' when a new issue is added. We only put it in the backlog if we're not going to do it right now, so having everything go into the backlog by default now is not great! Can my org IBISTechGroup please opt out until we can create custom statuses? |
|
I would expect "blocked" or "waiting" to be on there. |
|
This is breaking my existing project workflows. How do I turn it off? |
|
This idea of moving the status to be on issue level instead of Projects level is great. I prefer having the ability to disable this whole feature and its automation/syncing/actions.., at least until we update our workflows and apps to adapt to these new changes. |
|
@azenMatt Every git platform has common sense labels like You don't get to spontaneously redefine what industry standard words mean, nor do you get to redefine dictionary words based on your feelings. Do you "backlog" doors before walking through them? Do you backlog issues on LITERALLY ANY other platform? No, not a single one. You open issues. We've opened issues for as long as there have been places to post them. If I tell a layperson to open an issue, they know what I mean. If I tell them to backlog an issue, they do not. This is obvious because backlog is the entirely wrong word to use. You have mangled 290 existing statuses in a repo I care about WITH NO LOG OF THE CHANGES, and I'm mad about it. Revert this forceful change from industry norms and the English language. Give me granular statuses, not a forceful redefinition of the word "open". You have broken the workflow of many of companies with this, and it cannot be allowed to stay this way. From this paying customer on behalf of many others, please resolve this now. |
|
As said somewhere above: "Without the customization option, the feature is useless as the statuses don't match the columns we have on our project boards." |
|
I don't like the fact that there's like zero visual relationship between the UI elements suggestion it shifts from a: middle tiny dot, 1/4 of a circle, 1/2 a circle, 3/4 a circle, purple check mark. There should be more continuity between the icons for example: middle tiny dot (open) -> mostly solid green dot (done). |
|
Why is the initial staus called BACKLOG? |
|
I really like the idea of per-issue statuses, and the option to have that sync with some project status information. But, it's not AT ALL clear that the issue status influences project statuses. I created new issues in our repository, which got the default "Backlog" status. That's totally fine. Except it also updated the project status field to be Backlog as well, with no indication of why it got that status. Here's an example/test issue: cisagov/manage.get.gov#5666 The issue audit log shows that it was
At the very least, it should be clear WHY the status was changed, or what automation caused it to be changed. But, project status and issue status aren't always the same or shouldn't be presumed to be the same. I can see use-cases where that might be true, but it seems like it should be something to opt into or be warned about. |
|
This may have already been said, but IMO there's a gap between Issue 1: feature request that might be good for next major version ( It'd be nice to have something like NOTE: Currently 2 and 3 both end up as |
|
There was a link for feedback on this feature, so I clicked it and here is my feedback. This is unnecessary complexity, and I don't care for it. Before this addition, there were labels, milestones, fields, types...columns in the Project board thing...there comes a point where you've got too many ways to mark the status of an issue. I definitely don't care for the fact that this puts the way to close a bug in two different places, either. |
|
Seems more like a cosmetic change than being useful... I believe most people who would care about the status of issues alerady have Edit 1: I just realized there are Edit 2: UI bug: In a PR Edie 3: migration or UI bug: issues made prior to this change are still shown |
|
Like others have pointed out all this feature has done is broken that projects workflows. Even worse'er (yeah it's not a word, just role with it) is that you can't disable it and it appears that this is going to be a hard coded feature. Which again breaks a projects workflow because if a projects workflow is not in line with what gihubs hard coded feature, you either have to change your workflow. or customize your own workflow so it doesn't collide with this feature. I'm really happy that github added a feature that appears you cant opt-out of that has now broken my workflows. I'm so happy now that I have extra work to do so that I can bring what were working workflows back into a working state. Awesome github, love your work. |
|
Thanks for sharing this — I quite like the idea of having status at issue level, as it could make it easier to see where things stand without opening a project board every time. One thought, if it helps: you could try adding a couple of gentler in-between steps, like 'Planned' for work pencilled in for a later release and 'Waiting' for work that is paused for now. That might help smaller teams, where the jump from Backlog to Todo can feel quite big. It would also be reassuring to have a clear per-project opt-out, and a short note in the issue history when a status changes, so it is easier to see what changed and why. Just my two cents — keen to see how this develops. |
|
How can we turn off these changes? We use Status field in Project and Open/Closed state is enough for us. |
















Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
We have an upcoming release to bring the concept of 'status' as top-level meta data into issues.
Backlog -> Todo -> In progress -> In review -> done
This issue is for feedback from private preview partners on this change.
Updated
Thanks to your feedback we've recently rolled out a projects workflow to un-sync this with projects, which you can toggle on a per projects basis. See the screenshot below where to toggle this.
All reactions