Skip to content

History / HISTORY

Revisions

  • shipyard: complete phase 5 build — all phases done Phase 5 final results: - MigrationGuide.md created (156 lines, 5 version sections with before/after code) - DashboardDocker.md created (128 lines, Docker deployment guide) - Sidebar finalized with all new entries - Consistency pass: 0 stale references, 0 broken links, 0 remaining typos - Last MANIFEST typo fixed (explictly → explicitly) All 5 phases of the DotNetWorkQueue wiki 0.9.30 sync are complete. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 9, 2026
  • shipyard: plan phase 5 2 plans across 2 waves for New Pages + Final Polish: - Wave 1: MigrationGuide.md, DashboardDocker.md, sidebar updates - Wave 2: Consistency pass + full verification suite Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 9, 2026
  • shipyard: complete phase 4 build All 3 plans built and verified: - Wave 1: Trace.md rewrite (100 lines), Logging/Metrics/Admin fixes, MessageHistory/Interception verified - Wave 2: Scheduler.md Schyntax→cron, new JobScheduler.md (112 lines) - Wave 3: Dashboard security caveats, new Monitoring.md (86 lines), sidebar updated All 8 success criteria verified PASS. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 9, 2026
  • shipyard: plan phase 4 3 plans across 3 waves for Observability/Scheduler/Dashboard: - Wave 1: Trace.md enhancement, Logging/Metrics/Admin fixes, MessageHistory/Interception - Wave 2: Scheduler Schyntax→cron, new JobScheduler.md - Wave 3: Dashboard security caveats, new Monitoring.md, sidebar update Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 9, 2026
  • shipyard: complete phase 3 build All 7 plans built and verified: - Wave 1: Transports.md overview rewritten (version claims removed) - Wave 2: SQL Server, Redis, PostgreSQL, SQLite, LiteDb, Memory (all PASS) 16 transport pages updated. All Options stubs expanded to full property docs. All 8 success criteria verified PASS. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 8, 2026
  • shipyard: plan phase 3 7 plans across 2 waves for Transport Pages: - Wave 1: Transports.md overview (remove version claims) - Wave 2: SQL Server, Redis, PostgreSQL, SQLite, LiteDb, Memory (parallel) All Options stub pages get full property documentation from source. Verified READY — all files exist, no conflicts, all success criteria covered. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 8, 2026
  • shipyard: complete phase 2 build All 3 waves built and reviewed: - Wave 1: Sidebar, Home, Usage (PASS) - Wave 2: Consumer fixes + Linq→Method renames (PASS after retry) - Wave 3: Configuration + supporting pages (PASS) Phase verification: PASS. Security audit: PASS. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 8, 2026
  • shipyard: plan phase 2 3 plans across 3 waves for Core Usage Pages: - Wave 1: Sidebar, Home, Usage (foundation) - Wave 2: Consumer fixes + Linq-to-Method renames (critical) - Wave 3: Configuration + supporting pages Verified READY — all files exist, no conflicts, all success criteria covered. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 8, 2026
  • shipyard: capture project definition and roadmap for wiki 0.9.30 sync Full wiki sync planned across 5 phases covering ~50 pages. Key decisions: rename Linq→Method pages, add MigrationGuide/JobScheduler/Monitoring/ DashboardDocker pages, hybrid code samples with samples repo links. GitHub issue #112 created for dashboard screenshots. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>

    @blehnen blehnen committed Apr 8, 2026
  • shipyard: initialize project

    @blehnen blehnen committed Mar 28, 2026